
Sustainable development
928 kWp rooftop solar

Towards Net Zero




- 01
2024
928 kWp solar power - 02
2026
Scope 1–2 emissions measurement - 03
2028
20 % energy reduction per tonne - 04
2030
Scope 2 neutrality target - 05
2050
Net Zero
Saving energy at every process step
Rooftop solar
The solar panels on the plant roof supply part of the line's electricity during the day.
928 kWp · On the plant roof
Kiln heat recovery
Hot gas from the cristobalite kiln is used to dry incoming raw material, reducing fuel use in the dryer.
Kiln · Dryer
Inverters for motors
Inverters are fitted on exhaust fans, grinders and conveyors so motors run at the right load and avoid waste when under-loaded.
Grinders · Conveyors · Exhaust fans
Energy management under ISO 50001
Electricity is metered at each process step, kWh/tonne targets are set and reviewed regularly.
ISO 50001:2018 · kWh / tonne

